- Tawhā me te huru
- Inquiry
Equipped with the zero leakage double-check solenoid valves,this power unit fulfils the completeseparation of the two independent circuits,which are respectively for the main platform and subordinateplatform of the double scissors lift Four cut-off valves are used for emergency oil return in case of powerfailure.By increasing the number of the solenoid vavles,it is easy to get more independent circuits andto control the corresponding cylinders.
He Pukapuka Motuhake
1.The power unit is of S3 duty,which can only work intermittentlyand repeatedly,ie,1minute on and 9 minutes off.
2.Clean all the hydraulic parts concerned before mounting thepower unit.
3.Viscosity of the hydraulic oil shoud be 15-68 cst,which shouldalso be clean and free of impurities.N46 hydraulic oil isrecommended.ee of impurities,N46 recommended hydraulic oil.
4.This power unit should be mounted verticaly.
5Check the oil level in the tank after the initial operation of thepower unit.6.Oil changing is required after the initial 100 operation hours,aterwards once every 3000 hours.
Mahinga Whakahuahua
Parameters me te ahua
tauira |
Motini Volt |
Te Hiko Motuka |
Tere Whakatika |
displacement |
Te Pehenga Pūnaha |
Raukaha tank |
Solenoid Valve Voit |
YBZ5-G2.1J3H30E/MCDBN2 |
220VAC |
2.2KW |
2800RPM |
2.1ml / r |
25MPa |
25L |
24VDC |
YBZ5-G2.1J3H30E/MCDBN2 |
380VAC |
2.5ml / r |
220VAC |