- Parámetros y carácter
- Consulta
Equipped with the zero leakage double-check solenoid valves,this power unit fulfils the completeseparation of the two independent circuits,which are respectively for the main platform and subordinateplatform of the double scissors lift Four cut-off valves are used for emergency oil return in case of powerfailure.By increasing the number of the solenoid vavles,it is easy to get more independent circuits andto control the corresponding cylinders.
Notas especiales
1. La unidad de alimentación es de servicio S3, que solo puede funcionar de forma intermitente y repetida, es decir, 1 minuto encendido y 9 minutos apagado.
2. Limpiar todas las partes hidráulicas involucradas antes de montar la unidad de potencia.
3.Viscosity of the hydraulic oil shoud be 15-68 cst,which shouldalso be clean and free of impurities.N46 hydraulic oil isrecommended.ee of impurities,N46 recommended hydraulic oil.
4.This power unit should be mounted verticaly.
5Check the oil level in the tank after the initial operation of thepower unit.6.Oil changing is required after the initial 100 operation hours,aterwards once every 3000 hours.
Dimensión del esquema
Pparámetros y carácter
Model |
Voltios del motor |
Fuerza de motor |
Velocidad nominal |
Desplazamiento |
Presión del sistema |
Capacidad del tanque |
Voto de la válvula solenoide |
YBZ5-G2.1J3H30E/MCDBN2 |
220VAC |
2.2KW |
2800RPM |
2.1ml / r |
25MPa |
25L |
24VDC |
YBZ5-G2.1J3H30E/MCDBN2 |
380VAC |
2.5ml / r |
220VAC |